Customization: | Available |
---|---|
Type: | Crawler Excavator |
Usage: | Mining Excavator |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Engine | Travel System | ||||||||||||
Model | 6HK1X | Travel motors | KYB, Japan | ||||||||||
Type | Turbocharged, 4 Stroke, Direct injection, water cooled, | Support roller quantities | 2×8 | ||||||||||
Carrier roller quantities | 2×2 | ||||||||||||
No. of cylinder | 6 | Travel shoes | 2X48 | ||||||||||
Bore and stroke | 115x125(mm) | Travel speed | 3/4.7(km/h) | ||||||||||
Displacement | 7.79L | Drawbar pulling force | 180.4kN | ||||||||||
Power output | 212kw/2200rpm | Gradeability | 70%(350) | ||||||||||
Max. torque | 1080N.m/1500rpm | Ground clearance | 500mm | ||||||||||
Hydraulic System | Cab & Electrical System | ||||||||||||
Pump | KPM, Japan | Cab | Cab installed with silicon oil rubber, adjustable luxurious seat, cold and warm air-conditioning system plus flexible pilot control system | ||||||||||
Type | axial piston pump | ||||||||||||
Max. discharge flow | 2x280(L/min) | ||||||||||||
Max. discharge pressure | |||||||||||||
Boom, arm and bucket | 31.4/34.3 MPa | Voltage | 24V | ||||||||||
Travel circuit | 34.3 MPa | Batteries | 2X24V | ||||||||||
Swing circuit | 27.5 MPa | Battery capacity | 240Ah | ||||||||||
Control circuit | 3.9 MPa | Boom, Arm & Bucket | |||||||||||
Pilot control pump | Gear type | Boom cylinder | Ф140xФ100xS1480-L2045 | ||||||||||
Main control valves | KYB, Japan | Arm cylinder | Ф160xФ110xS1825-L2430 | ||||||||||
Oil cooler | Air cooled type | Bucket cylinder | Ф140xФ100xS1285- L1870 | ||||||||||
Swing System | Refilling Capacity & lubrication | ||||||||||||
Swing motor | KPM, Japan | Fuel tank | 550 L | ||||||||||
Swing motor type | Axial-piston motor | Cooling system | 36 L | ||||||||||
Hydraulic oil released | Hydraulic oil released | Engine oil | 35 L | ||||||||||
Hydraulic disc brake | Hydraulic disc brake | Hydraulic oil tank | 266 L Tank Oil Level | ||||||||||
Swing speed | 10 r/min | 340 L Hydraulic System | |||||||||||
Bucket | |||||||||||||
Type | Backhoe bucket | ||||||||||||
Bucket capacity | 1.6m3 (SAE) | ||||||||||||
Bucket capacity scope | 1.4-1.6 m3 | ||||||||||||
Number of bucket teeth | 6 | ||||||||||||
Bucket width | 1616 mm | ||||||||||||
Working Ranges | |||||||||||||
Boom length | 6470mm | ||||||||||||
A | Max. digging radius | 11100mm | B | Max. digging depth | 7380mm | ||||||||
C | Max. digging height | 10078mm | D | Max. dumping height | 7110mm | ||||||||
E | Min swing radius | 4348mm | F | Max. vertical wall digging depth | 6460mm | ||||||||
G | Max. digging reach at ground level | 10980mm | |||||||||||
Arm length | 3186mm | ||||||||||||
A | Bucket digging force | 191KN | B | Arm digging force | 175KN | ||||||||
Overall Dimensions | |||||||||||||
A | Track grounding length | 4050mm | I | Track shoe width | 600mm | ||||||||
B | Track length | 4940mm | J | Overall width | 3190mm | ||||||||
C | Counter weight ground clearance | 1220mm | K | Overall length | 11150mm | ||||||||
D | Tail swing radius | 3425mm | L | Overall height(to top of boom) | 3230mm | ||||||||
E | Overall height(to top of cab) | 3125mm | M | Track height | 983mm | ||||||||
F | Revolving frame width | 3185mm | O | Ground contact length(transport) | 5390mm | ||||||||
G | Min Ground clearance | 500mm | P | Track shoe thickness | 14mm | ||||||||
H | Track gauge | 2590mm | Q | Distance from swing center to tail | 3425mm | ||||||||
Operating Weight and Ground Pressure | |||||||||||||
Operating weight includes basic machine; | |||||||||||||
Operating weight | 35500 Kg | ||||||||||||
Ground pressure | 65.3 KPa |